Mekong Delta Region, Vietnam
2012.06 ~ 2019.04
Design & Construction Supervision
Cable Stayed Bridge: L=870.0m
Approach Bridge(Dong Thap side): L=1,099.7m
Approach Bridge(Can Tho side): L=999.7m
Width: B=24.5 ~ 25.8m (6 Lanes)
Design Speed: V=80Km/hr
CUU LONG CIPM
Korea Exim bank (EDCF)