Mekong Delta Region, Vietnam

2012.06 ~ 2019.04

Design & Construction Supervision

Cable Stayed Bridge: L=870.0m

Approach Bridge(Dong Thap side): L=1,099.7m

Approach Bridge(Can Tho side): L=999.7m

Width: B=24.5 ~ 25.8m (6 Lanes)

Design Speed: V=80Km/hr

CUU LONG CIPM

Korea Exim bank (EDCF)

Leave a Reply