Sri Lanka |
Feasibility Study for Water Supply project at Deduru Oya and Ruwansella cities
Sri Lanka
|
Feasibility Study
|
The Export-Import Bank of Korea
|
2011-12-28 ~ 2012-07-04
|
Feasibility Study |
The Export-Import Bank of Korea |
2011-12-28 2012-07-04 |
Sri Lanka |
The Master Plan for heavy industrial in Trincomalee, Sri Lanka
Sri Lanka
|
Master Plan
|
Ministry of Land, Infrastructure and Transport
|
2015-02-25 ~ 2015-12-21
|
Master Plan |
Ministry of Land, Infrastructure and Transport |
2015-02-25 2015-12-21 |
Sri Lanka |
Consultancy Services for Preliminary Design, Preparation of Tender Preparation Documents for Design and Build Contract for the
Sri Lanka
|
Design / Tender Preparation
|
Metro Colombo Urban Development Project (MCUDP)
|
2014-01-17 ~ 2014-09-30
|
Design / Tender Preparation |
Metro Colombo Urban Development Project (MCUDP) |
2014-01-17 2014-09-30 |
Sri Lanka |
Basic and Detail design works of Hazardous Waste Treatment Facility at Columbo, Sri-Lanka
Sri Lanka
|
Design
|
Korea International Cooperation Agency(KOICA)
|
2008-12-18 ~ 2010-05-17
|
Design |
Korea International Cooperation Agency(KOICA) |
2008-12-18 2010-05-17 |
Sri Lanka |
Feasibility Study of Eco Energy Center Construction in Sri Lanka
Sri Lanka
|
Feasibility Study
|
KECO
|
2011-08-04 ~ 2012-03-30
|
Feasibility Study |
KECO |
2011-08-04 2012-03-30 |
Sri Lanka |
Consulting Services for Construction of Solid Waste Disposal Facilities Project
Sri Lanka
|
Design / Supervision
|
Central Environmental Authority
|
2014-04-30 ~ 2018-01-29
|
Design / Supervision |
Central Environmental Authority |
2014-04-30 2018-01-29 |
Sri Lanka |
Feasibility Study for Construction of Solid Waste Disposal Facility in Sri Lanka
Sri Lanka
|
Feasibility Study
|
The Export-Import Bank of Korea
|
2009-11-05 ~ 2010-04-04
|
Feasibility Study |
The Export-Import Bank of Korea |
2009-11-05 2010-04-04 |
Sri Lanka |
Consulting Services for Solid Waste Management Program
Sri Lanka
|
Technical Assistance
|
Central Environmental Authority
|
2015-02-03 ~ 2015-08-28
|
Technical Assistance |
Central Environmental Authority |
2015-02-03 2015-08-28 |
Bangladesh |
Consultancy Services for Design, Construction Supervision and Contract Administration of Payra Ports First Terminal, Connecting
Bangladesh
|
Design / Supervision
|
PAYRA PORT AUTHORITY (PPA)
|
2019-05-08 ~ 2022-04-08
|
Design / Supervision |
PAYRA PORT AUTHORITY (PPA) |
2019-05-08 2022-04-08 |
Bangladesh |
Consultancy Service for 100,000 DWT Dry-Dock Project including Dock Gate & Other Facilities - Assignment A (Detailed Design
Bangladesh
|
Design / Tender Preparation
|
Karnafuly Dry Dock Limited
|
2015-06-06 ~ 2015-12-05
|
Design / Tender Preparation |
Karnafuly Dry Dock Limited |
2015-06-06 2015-12-05 |