AsiaHigway & AirportsTransportation Seoul ~ Sejong Expressway (Anseong ~ Guri Section) Seoul, Korea2016.07 ~ 2017.03Preliminary & Detailed Design Total Lengh: L=2.04km (B=30.6~36.6m, 6 lanes), V=120km/hr Concrete…관리자2020년 September 28일
AsiaBridge & StructurePCM and CS Vam Cong Bridge and Approach Bridge Construction Project Mekong Delta Region, Vietnam2012.06 ~ 2019.04Design & Construction SupervisionCable Stayed Bridge: L=870.0m Approach Bridge(Dong Thap…관리자2019년 October 25일
AsiaHigway & AirportsTransportation Gimpo ~ Paju Expressway (Section 2) Gimpo, Korea2019.07 ~ 2020.07Detailed Design Length: L=6.74km, B=23.4m Design Speed: V=100km/hr 2 Bridges: L=110m 2…관리자2019년 July 2일
AsiaRail & Transit SystemTransportation Extension of Incheon Subway Line No. 1 to Gumdan (Section 1) Incheon, Korea2019.04 ~ 2020.06Detailed Design Length: L=3,307.91m Single Parallel Tunnel: L=2,140.5m Double Track Tunnel: L=1,743.1m…관리자2019년 April 2일
AfricaHigway & AirportsTransportation Dar es Salaam Bus Rapid Transit (BRT) Infrastructure Project (Phase 4) Dar es Salaam, Tanzania2019.02 ~ 2023.03Detailed Design & Construction Supervision Total Length: L=30.12km Width: 6…관리자2019년 February 2일
AsiaGeotechnical & Underground SpaceRail & Transit SystemTransportation Yeongjong ~ Cheongra Connecting Road (3rd Yeonyuk Bridge) Incheon, Korea2018.07 ~ 2020.07Detailed Design Total Length: L=3.6km (Marine Bridge) Width: B=29.0m (6 lanes) Incheon…관리자2018년 July 2일
AsiaBRT & ITSTransportation Cebu Bus Rapid Transit(BRT) System Cebu, Philippines2015.05 ~ 2018.05Detailed Design & Construction Supervision N.Escario St: L=2.04km Cebu South, Rd~Bacalso Ave:…관리자2018년 May 29일
AsiaHarbor & WaterfrontTransportation Donghae Port Construction Project (3rd Phase – North Breakwater Section No. 2) Donghae, Korea2016.02 ~ 2016.06Alternative Design North Breakwater: L=1,000m (11,000 ton) Berth facility: 72m Caisson casting…관리자2016년 June 2일
AsiaHarbor & WaterfrontTransportation Jeongok Marina Port Development Project Hwaseong, Korea2016.02 ~ 2016.06Detailed Design Offshore breakwater: L=114.0m Sea wall levee: L=52.8m Yacht mooring facilities…관리자2016년 February 2일
AsiaBRT & ITSTransportation Osan Station Transit Center Osan, Korea2013. 04 ~ 2014. 10Detailed Design Project Area: A=21,800m3 Bridge: L=413.126m Osan CityGovernment of…관리자2014년 October 29일
AsiaHigway & Airportsmain-project Chuncheon – Yangyang Expressway (Chuncheon JCT) Seoul~Yangyang expressway is an expressway in Korea, connecting the cities of Seoul and Yangyang City.…관리자2010년 December 8일
AsiaGeotechnical & Underground SpaceLand DevelopmentLand Development & Urban Planning Paju Unjeong New Town Project Paju Unjeong New Town, located in the Unjeong district of Gyoha-eup, Paju-si, Gyeonggi-do, is a…관리자2005년 July 21일
AsiaHigway & AirportsTransportation Youngdong Expressway Construction (Waljeong ~ Gangnueng Section) Gangnueng Junction connects the Yeongdong Expressway and the Donghae Expressway, which is installed across Songam-ri…관리자1996년 September 2일